Waste Stabilization Pond System (overloaded)

This is an example of an optimal waste stabilization pond system, consisting of a 1-day, 3-m deep anaerobic pond followed by a 3-day, 1.5-m deep facultative pond, with treatment of sludge from the anaerobic pond using a drying bed with 30 days of storage.

Gögn og tilföng

Viðbótarupplýsingar

Svæði Gildi
Höfundur Matthew Verbyla
Síðast uppfært 13. júlí 2020, 16:29 (UTC+00:00)
Stofnað 13. júlí 2020, 16:28 (UTC+00:00)