Lubigi Sewage and Fecal Sludge Treatment Plant

The Lubigi Sewage and Fecal Sludge Treatment Plant, which consists of waste stabilization ponds, a fecal sludge sedimentation basin, and covered sludge drying beds, started operation in 2014. In 2019, it was treating 4,888 m^3 of sewage and 343 m^3 of fecal sludge per day on average. The maximum daily flow rate for sewage was ~3 times higher than the average daily flow rate, and the maximum volume of fecal sludge received per day was ~2 times higher than the average daily volume.

Data and Resources

Additional Info

Field Value
Author K2P Sketcher
Maintainer Matthew Verbyla
Last Updated Kasım 16, 2020, 16:53 (UTC)
Created Mayıs 11, 2020, 15:08 (UTC)
location Uganda
organization National Water and Sewerage Corporation