Waste Stabilization Pond System (overloaded)

This is an example of an optimal waste stabilization pond system, consisting of a 1-day, 3-m deep anaerobic pond followed by a 3-day, 1.5-m deep facultative pond, with treatment of sludge from the anaerobic pond using a drying bed with 30 days of storage.

Data e Risorse

Informazioni addizionali

Campo Valore
Autore Matthew Verbyla
Ultimo aggiornamento Luglio 13, 2020, 16:29 (UTC)
Creato Luglio 13, 2020, 16:28 (UTC)