-
Jinja Kirinya
This system is located in the central region of Uganda, within the town of Jinja, close to the shores of Lake Victoria. The treatment plant receives sewage and fecal sludge. The... -
Gulu Wastewater Treatment Plant
Non Conventional WWTP serving Gulu, Uganda -
Mbarara WSP Sketch
WWTP in Africa, Uganda, Mbarara, Western region -
Mbale Doko WSPs
Africa, Uganda, Mbale, Eastern -
Tertiary Biological Treatment
A sketch of a typical wastewater treatment system that provides primary treatment (e.g., settling or clarification) plus secondary biological treatment (activated sludge) and... -
Waste Stabilization Pond System (overloaded)
This is an example of an optimal waste stabilization pond system, consisting of a 1-day, 3-m deep anaerobic pond followed by a 3-day, 1.5-m deep facultative pond, with treatment... -
Waste Stabilization Pond System (optimal)
This is an example of an optimal waste stabilization pond system, consisting of a 5-day, 3-m deep anaerobic pond, a 15-day, 1.5-m deep facultative pond, and a 20-day, 1-m deep... -
Secondary Biological Treatment
A sketch of a typical wastewater treatment system that provides primary treatment (e.g., settling or clarification) plus secondary biological treatment (activated sludge), with... -
Primary Treatment
A sketch of a typical wastewater treatment system that provides primary treatment only (e.g., settling or clarification), with sludge treated in a drying bed for 180 days.
E' possibile inoltre accedere al registro usando le API (vedi Documentazione API).