Lubigi Sewage and Fecal Sludge Treatment Plant

The Lubigi Sewage and Fecal Sludge Treatment Plant, which consists of waste stabilization ponds, a fecal sludge sedimentation basin, and covered sludge drying beds, started operation in 2014. In 2019, it was treating 4,888 m^3 of sewage and 343 m^3 of fecal sludge per day on average. The maximum daily flow rate for sewage was ~3 times higher than the average daily flow rate, and the maximum volume of fecal sludge received per day was ~2 times higher than the average daily volume.