Waste Stabilization Pond System (overloaded)

This is an example of an optimal waste stabilization pond system, consisting of a 1-day, 3-m deep anaerobic pond followed by a 3-day, 1.5-m deep facultative pond, with treatment of sludge from the anaerobic pond using a drying bed with 30 days of storage.

Duomenys ir ištekliai

Papildoma informacija

Laukas Reikšmė
Autorius Matthew Verbyla
Last Updated 2020 m. liepos 13 d., 16:29 (UTC+00:00)
Sukurtas 2020 m. liepos 13 d., 16:28 (UTC+00:00)