Lubigi Sewage and Fecal Sludge Treatment Plant

The Lubigi Sewage and Fecal Sludge Treatment Plant, which consists of waste stabilization ponds, a fecal sludge sedimentation basin, and covered sludge drying beds, started operation in 2014. In 2019, it was treating 4,888 m^3 of sewage and 343 m^3 of fecal sludge per day on average. The maximum daily flow rate for sewage was ~3 times higher than the average daily flow rate, and the maximum volume of fecal sludge received per day was ~2 times higher than the average daily volume.

数据与资源

其他信息

价值
作者 K2P Sketcher
维护者 Matthew Verbyla
最近更新 十一月 16, 2020, 16:53 (UTC)
创建的 五月 11, 2020, 15:08 (UTC)
location Uganda
组织 National Water and Sewerage Corporation