Waste Stabilization Pond System (overloaded)

This is an example of an optimal waste stabilization pond system, consisting of a 1-day, 3-m deep anaerobic pond followed by a 3-day, 1.5-m deep facultative pond, with treatment of sludge from the anaerobic pond using a drying bed with 30 days of storage.

資料與資源

額外的資訊

欄位
作者 Matthew Verbyla
最後更新 七月 13, 2020, 16:29 (UTC)
建立 七月 13, 2020, 16:28 (UTC)